Particularities
-

- Quality Improvement
- Our Kumkang Aluminum Formwork produces an unbeatable concrete finishing which does not require any plastering and eliminate grinding task due to joints created by panels.
-

- Cost Reducer
- As our aluminum formwork allows an average of 6 days cycle, it considerably reduces the construction period. Reducing construction period will directly reduce the costruction cost.
-

- Time Saver
- The Kumkang Aluminum Formwork system allows a single pour of wall, beam, column, slab and staircases. Furthermore, our prop-head system will allow to dismantle the slab panels without removing the props. Thus, 6 days cycle is no longer a dream but a reality.
-

- Safety Provider
- Compared with the conventional method, our formwork system will allow a large working area for jobsite workers (fewer props). Furthermore, through the supply of external working platform, jobsite workers will feel much safer and increase their efficiency.
-

- Eco Friendly
- Aluminum formwork generates significantly less construction waste compared to conventional formwork. By minimizing the size of flat tie slots, it effectively reduces concrete leakage, which in turn decreases the need for surface chipping. Furthermore, aluminum formwork is designed for repeated use, eliminating the generation of timber-based waste.
-

- Total System
- With our Kumkang Aluminum Formwork, shoring and external working platforms are also supplied.