Setting Process
-
01
Structural line and level check
-
02
Installation of I/C and wall panels
-
03
Installation of beam and SC panels
-
04
Installation of staircase panels
-
05
Installation of slab panels
-
06
Installation of slab panels
-
07
Installation of electrical, plumbing components and steel rebar.